Industrial Park / Campus Program

ND-v2009 PIf1:Development Program and Site Type
posted by  Rodrigo Gomez Junco  on 

We have a client who is planning on building an industrial park. Initially our idea was to approach the certification through the Campus Program.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Thu Nov 7, 2013, 6:23 pm

Non-toxic Rodent Bait

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Jerad Furze  on 

I am working on a project in Canada where the Pest Management vendor uses a product called "Detex Blox".

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Nov 7, 2013, 3:51 pm

Project in Europe

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Anna Korinkova  on 

Are there any testing facilities in Europe capable of measuring SRI values? Our project can easily achieve this credit, however, we are not able to get SRI values from our suppliers.

5
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Thu Nov 7, 2013, 8:59 am

Car-shared (zip car) parking spaces

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Kathy Kwong  on 

Can car-shared (zip car) parking spaces be accepted as low-emitting /fuel efficient vehicle parking in a project as compliance to option 1?

3
Thu Nov 7, 2013, 1:34 am

Steel manufacturer letter regarding raw materials extraction

NC-2009 MRc5:Regional Materials
posted by  Lilian Seow  on 

Hi, I need help with interpretation with this letter which I'm sure some of you may have the same from the manufacturer.

3
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Wed Nov 6, 2013, 11:59 pm

Daylight control in Kitchen

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Jatuwat Varodompun  on 

I am working on the restaurant project. For the kitchen with small windows, do I need to provide daylight sensor for this zone and how. thanks

5
Principal
Clanton Associates
LEEDuser Basic Member
46 thumbs up
Wed Nov 6, 2013, 10:21 pm

WEp1 - Total Daily Usage Rates

CS-2009 WEp1:Water Use Reduction
posted by  Krista Wayne  on 

The comment has come up for several project so far and know that this partiualr problem is going to keep coming up in upcoming projects.

2
Default Avatar
Senior Project Manager
JLL
LEEDuser Basic Member
0 thumbs up
Wed Nov 6, 2013, 8:00 pm

Opaque panels

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

Similarly to the situation of this picture http://www.waymarking.com/gallery/image.aspx?f=1&guid=89c50354-3bc4-459b-a423-3b962523167c in the windows that I’m modelling there is a transparent pa

3
Wed Nov 6, 2013, 4:36 pm

System 7: selection of heating system

NC-2009 EAp2:Minimum Energy Performance
posted by  Roberto Oshiro Gama  on 

I,m working on a project were the proposed building has 2 ground water heat pumps with total capaciyt approx. 2300 kW.

3
Wed Nov 6, 2013, 4:23 pm

T8 LED light specifications

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Mahbuba Khan AIA, LEED AP BD+C  on 

To achieve energy efficiency a project in Bangladesh is planning on buying T8 LED lights with following specifications.

2
Tue Nov 5, 2013, 10:34 pm